Work Order WO-001 · Team Work Order
Foundation Dig
Excavate a marked footing, haul the spoil and level the pad before the inspector signs off.
- Crew:
- 2–4 operators
- Equipment:
- Bulldozer, Excavator, Dumper

The Job Board · coming soon
Work orders for future crews: timed jobs, team challenges and leagues we're planning. Nothing is launched yet — help us shape it.
Posted work orders
Work Order WO-001 · Team Work Order
Excavate a marked footing, haul the spoil and level the pad before the inspector signs off.
Work Order WO-002 · Timed Work Order
Load, haul, dump, repeat. How many clean loads can your crew move before the shift horn?
Work Order WO-003 · Precision Work Order
A washed-out access road. Rebuild the base, grade the ramp and get the haul trucks moving again.
Work Order WO-004 · Future Concept
Infrared-tag tank skirmishes across the miniature terrain. Still on the drawing board — tell us if you'd play.
Interactive preview
Tap each task in sequence to see which trade takes over the job.
Excavate a marked footing, haul the spoil and level the pad before the inspector signs off.
Interactive preview only. It does not connect to or control any machines.
Crew list
Let us know and we'll reach out if and when work orders and leagues launch.